Cheteshwar Pujara replaced, BCCI announces new vice-captain for India-Australia Test series

KEY STORY

  • The Board of Control for Cricket in India (BCCI) has made a big change before the final two Test matches against Australia as they have dropped Cheteshwar Pujara from the vice-captaincy post. He has been replaced by Rohit Sharma, who joined the team earlier this week.

Cheteshwar Pujara has been replaced.

  • The most senior batsman in the present line-up, Pujara was appointed as Ajinkya Rahane’s deputy for the 2nd Test match which took place in Melbourne. He has been dropped after one Test match.
  • The move comes as a big surprise as Rohit isn’t even a permanent member of the Test team. Though the latest update confirms that he will be playing the 3rd Test match. Team India’s white-ball vice-captain since 2017, Rohit is now set to be part of the leadership group for the first time in the longest format.
  • Rohit, who had made his much-awaited Test debut in 2013, has played 32 Tests so far. He has scored 2141 runs in the longest format, which includes six centuries. The senior batsman remained an irregular member of the playing XI for the first six years.

CONCLUSION

  • Even after his success in the 2019 World Cup, he was kept out of the playing XI against West Indies during India’s tour of the Caribbean islands. Before the start of the home season, he was handed the opener’s role. A calf injury halted his run in Tests and he hasn’t played a red-ball game since November 2019.
  • Rohit has joined the Test team in Melbourne and will soon travel to Sydney with other members. If he opens the innings, then Rohit will likely replace Mayank Agarwal in the playing XI. Should he bat in the middle-order, Hanuma Vihari might have to make way for him.
  • The 3rd Test match of the series takes place in Sydney from January 7. The four-match Test series is levelled at 1-1.

Tourism dept issues series of guidelines for hotels, resorts

KEY STORY

  • The Karnataka tourism department has issued guidelines for hotels, resorts and bars, in the wake of rising cases of drugs being found.

Tourism

  • While tourism is flourishing despite the pandemic, such illegal activities will drive away tourists and mar the state’S image, and compromise the safety of domestic and international tourists, the department said.
  • Property owners have been directed to submit documents to the Assistant Commissioner of Bengaluru, within 15 days.
  • The list of documents include: No Objection Certificate from jurisdictional police station, BBMP and other departments, clearance from Karnataka State Pollution Control Board and food safety department.

CONCLUSION

  • Fire and emergency department guidelines should be adhered to, besides clearance from forest department irrespective of whether it falls under eco-sensitive zones or not, licence from excise department, certificate from income-tax department, clearance and certification from the National Stunts Academy if stunts are being preformed, and monthly financial statements.
  • The guidelines also state that the property owner must display the availability of rooms, rates and Covid- 19 guidelines being adhered to.

COVID vaccine dry run across states on January 2; Union Health Minister holds review meet

KEY STORY

  • A day ahead of pan-India dry run for COVID-19 vaccine, Union Health Minister Harsh Vardhan on Friday said “preparation for the dry run of vaccination is in the final stage.” All states are set to conduct coronavirus vaccination dry run on January 2.

Union Health Minister Harsh Vardhan

  • The Union Health Minister, during a virtual coference, also said “target of this exercise is that minutest details are thoroughly researched. At least two vaccines have sent their applications to Drug Controller and experts for approval, their data are being studied pro-actively.”
  • According to a report in The New Indian Express, the dry run is proposed to be conducted in all state capitals in at least three session sites but some states will also include districts that are situated in difficult terrain or have poor logistical support.
  • Maharashtra and Kerala, on the other hand, are likely to schedule the dry run in major cities other than their capital cities.
    “The lists of health workers have been created and will be uploaded on COVID platform. Just like we prepare during elections, the same way we need to train each member of all medical teams responsibly,” said Harsh Vardhan during a review meet with the Delhi government for the preparation of dry run of COVID-19 vaccination.
    “After training over 2,000 master trainers at the national level, the training is underway at state and district level, in over 700 districts.” he added.

Covid-19: Karnataka yet to trace 175 UK returnees

KEY STORY

  • The Karnataka home department, which is continuing its efforts to trace the missing UK returnees in the state, is yet to find 175 of them, including 80 foreigners. Thirty returnees have tested positive for Covid-19, and seven of them for the new strain.
  • As of Wednesday evening, the state was looking for 199 people and found 24 late Thursday. Officials said returnees have fallen off the radar mainly because of wrong or inactive mobile numbers.
  • Health minister K Sudhakar said: “Four contacts of the UK returnees have tested positive. Now, 30 returnees and their four contacts are in isolation at government facilities and all their contacts are under surveillance.”


    Will find them: Minister

  • Of the missing UK returnees, 80 are not Indian citizens. This means we do not have their contact details. But the home department is pursuing the matter and will find them soon,” health minister K Sudhakar said.
  • Experts told TOI that governments must be cautious about the new variant even though not many cases have come to the fore yet. It is important to isolate the imported cases and test all those who have come in contact with them, they added.

PM Modi to launch Light House projects in six cities on New Year

KEY STORY

  • Prime Minister Narendra Modi will lay the foundation stone of Light House Projects under Global Housing Technology Challenge-India (GHTC-India) at six sites in as many states on January 1.
  • It will showcase the best of new-age alternate global technologies, materials and processes in the construction sector for the first time in the country at such a large scale.
  • Officials said that the PM will also announce winners under Affordable Sustainable Housing Accelerators-India (ASHA-India) and give out annual awards for excellence in implementation of the Pradhan Mantri Awas Yojana – Urban (PMAY-U) Mission. The  Mission has been designed to achieve the vision of ‘Housing For All by 2022’.
  • During the event, the PM will also release a certificate course on innovative construction technologies named NAVARITIH (New, Affordable, Validated, Research Innovation Technologies for Indian Housing) and a compendium of 54 innovative housing construction technologies identified through GHTC-India.

CONCLUSION

  • Light House Projects are being constructed at Indore (MP), Rajkot (Gujarat), Chennai (Tamil Nadu), Ranchi (Jharkhand), Agartala (Tripura) and Lucknow (UP). They comprise about 1000 houses at each location along with allied infrastructure facilities.
  • The LHPs will serve as live laboratories for facilitating transfer of technology to the field and its further replication.
  • This includes planning, design, production of components, construction practices and testing for both faculty and students of IITs, NITs, other engineering colleges, planning and architecture colleges, builders  and other stakeholders.
  • ASHA-India aims to promote domestic research and entrepreneurship by providing incubation and acceleration support to potential future technologies.

Covid vaccination dry run in Karnataka districts, taluks, PHCs

KEY STORY

  • Karnataka will conduct vaccination dry runs at three sites each in five districts — Bengaluru (BBMP limits), Kalaburagi, Shivamogga, Mysuru and Belagavi — on January 2.
  • Dr Rajani Nageshrao, Deputy Director, Immunisation, Department of Health and Family Welfare, said, “The dry run will be held in five districts for a full day at the district hospital, taluk hospital and primary health centre levels.”
  • Everything that is needed to conduct Covid-19 vaccination, excluding the vaccine itself and the vaccination procedure, will be part of the dry run in the state, she said.
  • The aim of the exercise is to understand how the actual vaccination and all related events must take place in accordance with set procedures.
  • Three rooms, waiting area, syringes, people to be vaccinated (health care workers), vaccinators who will administer the vaccine, AEFI (adverse event following immunization) kit — which is generally kept during all immunisation programmes — and observation room will be kept ready. The orientation will take place on Friday,” Dr Rajani added.
  • The health care workers, who are beneficiaries, will receive a message asking them to come for the vaccination along with their ID proof.
  • Their names will be recorded in the computer, a person deputed for mock vaccination will carry out mock procedure of vaccination and the person who has been ‘vaccinated’ will be made to sit in the observation room for half an hour.
  • The procedures will be similar to those which will be followed at the time of actual vaccination. A dummy app has also been made ready for this purpose.

CONCLUSION

  • In Kalaburagi, the dry run will be taken up in Ashoknagar Urban PHC, Aurad Rural PHC and Jewargi Taluk hospital, sources said. After the dry run is over, the challenges and difficulties faced, especially at the PHC level, will be highlighted, corrected and feedback shared with the Central Government. The challenges that crop up are expected to hold good for the whole state.
  • Another dry run is not planned yet. Around 75-100 vaccinators and 375 beneficiaries are expected to be part of the dry run in Karnataka.
  •  The Health department, in a press release, stated that the dry run will be an exercise for end-to end-testing of Covid vaccination process, except the actual vaccination, and will include planning, preparation including pre-requisites for vaccine introduction as per the operational guidelines and use of CoWIN portal, uploading beneficiary and session site details, verification of documents at session sites, mock drill of beneficiary vaccination and reporting.
  • Some of the primary objectives include assessing the operational feasibility of using Co-WIN application in field environment and to test linkages between planning implementation and reporting mechanisms.

Karnataka has 7 cases of new COVID-19 strain; 199 UK returnees missing: Health Minister K Sudhakar

KEY STORY

  • Bengaluru (Karnataka): The total number of people confirmed to be infected with the new UK strain of COVID-19 virus has risen to 25 in India. Of these, seven persons have been detected with the new coronavirus variant in Karnataka.

Karnataka Health Minister Dr K Sudhakar

  • Karnataka Health Minister Dr K Sudhakar on Wednesday said that there are seven people in the state who have been detected with the new COVID-19 variant, which is more infectious and transmissible.
    “Out of the UK returnees, seven people in Karnataka have contracted this new variant. 3 under Bruhat Bengaluru Mahanagara Palike (BBMP) limits and 4 in Shivamogga are infected. Everyone must follow the government guidelines to contain new variant, institutional quarantine must be strictly adhered with,” Sudhakar said yesterday.
  • The minister said of the total number of people who have returned to the state from the United Kingdom where the new variant was first detected, 30 have tested positive for COVID-19 and four of their relatives have also contracted coronavirus.
    Out of these 30, the new variant has been detected in seven persons.
  • The minister said 199 people who returned from the UK are missing and 80 of them are foreign nationals. 24 people have been traced by our home department yesterday, he said.

CONCLUSION

  • “We are making all possible efforts to trace the others,” the minister stated.
  • Meanwhile, Karnataka yesterday reported 973 new coronavirus cases and seven deaths. The overall COVID-19 tally in the state has risen to 9,18,544, while the death toll stands at 12,081.
  • The health department said 1,217 patients recovered from the disease yesterday and a total of 11,610 active cases are there in the state. Overall recoveries stand at 8,94,834.

Deadline for mandatory FASTag extended; here’s how to buy it online

KEY STORY

  • The Ministry of Road Transport and Highways (MoRTH) had made it mandatory for all vehicles to use FASTag from 1 January, 2021. However, considering that many motorists are yet to buy a FASTag and are making cash payments at toll plazas, the ministry has now decided to extend the deadline till 15 February, 2021.

Deadline for mandatory FASTag extended; here's how to buy FASTag online

  • This means that all vehicle owners will now have time till 15 February to get a FASTag affixed. In case you didn’t know, FASTag is an electronic toll collection mechanism which includes an RFID tag affixed to the windscreen of a vehicle. The rechargeable tag is linked to a prepaid account/e-wallet from which the charges are automatically deducted at toll booths. This negates the need to stop at toll plazas to make the payment, thereby resulting in swifter movement of traffic.
  • Currently, all but one lane at all toll plazas on national highways have been made FASTag lanes to ensure a swift movement of traffic. Any vehicle without a FASTag entering this lane is bound to pay double the toll amount as penalty.
  • However, there is one lane that is dedicated for cash payments. But the government wants to do away with this and from 15 February, all lanes will be converted into FASTag lanes. If you are yet to purchase a FASTag, then here’s how you can do it online.

    How to buy FASTag online?

  • For buying FASTag via your registered bank, you can check the registered website of the banks like ICICI Bank, Axis Bank, HDFC Bank, SBI, etc. as they are authorised FASTag partners. There are around 22 banks that have been authorized to issue FASTag.
  • You can then look for FASTag option on the website and click on the ‘Apply for FASTag’ option. Then simply enter your vehicle number and registered mobile number to receive an OTP.
  • After this, enter the prompted details like name, address, etc. and upload necessary documents. After this, you will have to make an online payment for the FASTag; it has a one-time fee of ₹200, reissuance fee of ₹100, and refundable security deposit of ₹200.

     

  • Users can also purchase FASTag using Amazon.in, PayTM, Airtel Payment App, and Google Pay.

Getting started for return: Rohit Sharma joins Test team, takes part in practice session – see pics

KEY STORY

  • Following the completion of his 14-day isolation period in Australia, Rohit Sharma joined his teammates in Melbourne after the end of the 2nd Test match. Just a day after landing in the camp, Rohit hit the field and took part in his first practice session in Australia.

Rohit Sharma took part in practice session on Thursday (December 31). Photo: BCCI

  • A few hours back, the BCCI shared a couple of pictures of Rohit taking part in a fielding session. The senior batsman was in full flow as he also dived. The members of Team India are still in Melbourne and will leave for Sydney in the next few days. Check out Rohit’s pics –

  • Rohit, who led Mumbai Indians to their fifth IPL title victory, hasn’t played competitive cricket since November 10. He was named in the Test squad but did not fly to Australia from UAE as he had to return home due to personal reasons. Later, the BCCI asked him to clear a fitness test.

CONCLUSION

  • Rohit underwent the test at the National Cricket Academy on December 11 and flew to Australia in the next couple of days. As per the protocols, Rohit had to stay in isolation for two weeks, which ruled him out of the first two Tests.
  • The BCCI will be assessing his fitness in the next few days and should he be given a green signal by the trainers, Rohit will be an automatic selection in the playing XI.
  • In 2019, Rohit was promoted as an opener in Tests after he was considered too good a player to warm the bench. If Rohit plays as an opener, he might replace Mayank Agarwal, who is yet to play a big knock in Australia.
  • If asked to bat in the middle-order, Rohit might replace Hanuma Vihari. The chances of Vihari being dropped for Rohit are more.
  • The visitors will have a forced change as well. Senior pacer Umesh Yadav has been ruled out of the Test series. Since the BCCI hasn’t named his replacement, Navdeep Saini is the only pacer in the squad to take his spot. The third Test will be played in Sydney from January 7.

BJP, Congress Claim Big Victory In Karnataka Panchayat Polls

KEY STORY

  • Both the ruling BJP and opposition Congress in Karnataka on Wednesday claimed major victories for candidates backed by them in the recent elections to over 5,700 village panchayats even as the counting of votes polled in the grass-root level exercise was underway.

BJP, Congress Claim Big Victory In Karnataka Panchayat Polls

  • The elections, not held on party symbols, were conducted to 82,616 seats in 5,728 village panchayats in two phases on December 22 and 27 using ballot papers with a voter turnout of 78.58 per cent, and counting was taken up on Wednesday morning.
  • Karnataka State Election Commission officials said counting was on at 226 centres at the Taluk headquarters by adhering to strict COVID-19 protocol of mandatory wearing of face masks, social distancing, and hand hygiene.
  • Though there was no official declaration of results till night, BJP state chief Nalin Kumar Kateel and senior Congress leader Siddaramaiah maintained that candidates backed by their parties were winning in maximum seats.
  • A total of 2,22,814 candidates contested the election, while 8,074 were elected unopposed.
  • Though these polls are not held on party symbols, all political parties have put in efforts to ensure that the candidate supported by them wins, so as to have their hold on grass-root level politics.
  • In a statement, Nalin Kumar Kateel said BJP “won maximum seats”, for which he gave credit to various strategies drawn by the party.
  • He said rural-centric schemes such as Gram Swaraj and activation of booth level committees helped in taking to the people the measures initiated by the Central and state governments for development.
  • “People supported the development and voted in favour of the BJP backed candidates,” Nalin Kumar Kateel said.
    CONCLUSION
    Siddaramaiah in a series of tweets claimed that the farmers taught the BJP a lesson.
    “Rural India is frustrated by the policies implemented by @BJP4India. Farmers are against anti-farmer laws and they found Gram Panchayat elections as the perfect opportunity to teach @BJP4India a lesson. Reports suggest that @INCKarnataka supported candidates are winning,” he said.
    “Congress has always stood firmly with farmers and rural India. This has always instilled confidence among people. The tradition of winning has continued,” he tweeted.
    Noting that this was a challenging time for the Congress in the state, the former chief minister expressed apprehensions that the BJP might lure its winning candidates to switch over. The JD(S) has not yet made any statement on the poll outcome.